VertDivider

First fix What the Pride in the Job judges are looking for

A large area with lots to consider, here the judges will be looking for the quality of workmanship and signs of extra care and attention - a real pride in the job. They'll be checking the installation of doors and windows, floor decking, stairs, electrics, plumbing, the construction of non load-bearing walls and quality of plastering.

NHBC technical guidance for first and second fix

NHBC Standards Chapter 8.1 Internal services

Discharge pipes from UVHWSS in garages
Earth bonding - certificate of compliance
Pipe insulation in airing cupboards
Earth bonding plastic plumbing
Use of flexible ducting to connect SVP
TRVs and room thermostats
Insulation of heating pipes in timber floors
Electrical - earth bonding metal back boxes
Sound insulation of soil pipes in floor voids
Extract fans - air leakage
Plastic plumbing - pipe support
Plastic plumbing - insulation
Air Admittance Valves
Wiring to wall lights (amended April 2011)
Consumer unit - labelling (amended April 2011)
Metal splashbacks - earthing/bonding
Sound proofing to SVP's 
Fixing to cable trays (new April 2011)

VertDivider

About Pride in the Job

winners resources

a judge's view