Welcome to the NHBC
MMC Hub

The resource centre for offsite and other non-conventional construction

Hybrid

Hybrid relates to off-site manufacture of volumetric bathroom/kitchen pods in factory conditions used in combination with panelised building systems or other forms of construction.

Reference should be made to NHBC Standards Chapter 2.1 The Standards and Technical Requirements, Technical Requirement R3a).

Care must be taken to ensure that the Construction meets relevant Building Regulations, NHBC Standards, British Standards, Eurocodes and (or) statutory requirements on a site-by-site basis.

When hybrid systems currently accepted by NHBC become available they will be listed below.